Hillstar Construction Licensed & Insured · CSLB #972213 310-975-7590

Build Your ADU in Los Angeles

Design, permits, and full build — one licensed LA team. Most projects complete in 3–6 months. Free on-site consultation, 24-hour response.

Permits handled in-house Licensed & insured 24-hour response
Get My Free Budget Range Call 310-975-7590 ★★★★★ 5.0 · 17 Houzz reviews
Since 2010LA general contractor Since 2010 · LA GC
35+ yearsConstruction experience 35+ yrs experience
5.0 ★ · 17Houzz reviews 5.0 ★ · 17 Houzz
CSLB #972213Licensed & insured CSLB #972213 · Licensed
LA + SFVServing the full Valley LA + SFV · Full Valley
Hillstar ADU project in Los Angeles Finished ADU interior with exposed beams by Hillstar ADU kitchen interior by Hillstar Construction

Every Type of ADU

The right ADU depends on your lot size, setbacks, and how you plan to use the space. We build all four common configurations.

Detached ADU

A standalone unit in the backyard, fully separate from the main home. Most flexible when lot space allows.

Attached ADU

An addition that shares a wall with the existing house, usually off the side or rear of the main structure.

Garage Conversion

Turn an existing attached or detached garage into a livable unit — typically the most cost-effective path.

Above-Garage ADU

A second-story unit added on top of an existing garage. A strong option when the lot footprint is tight.

What an ADU Does for You

For most LA homeowners the biggest reason to build is simple: a new ADU pays you back every month.

Generate Rental Income

A new long-term tenant on your existing lot — additional monthly cash flow without buying more land.

Create Passive Income

Build equity and a recurring income stream that compounds — not a one-time sale.

Turn Your Garage Into Revenue

Convert underused garage space into a livable, income-producing unit — typically the most cost-effective path.

Your ADU Build in 4 Steps

A straight path from first site visit to final inspection.

Free Consultation

We visit your lot, review setbacks, utilities, and access, and talk through what's realistic for your property.

Design & Permits

Architectural plans and engineering, then full submission to the city — through plan check to approval.

Full Build

Foundation, framing, MEP, drywall, kitchen, bathroom, finishes — our in-house crew stays on your job.

Final Inspection

We coordinate the final city inspections and sign-off, then walk the finished ADU with you.

Get a Free ADU Budget Range in 24 Hours

Tell us about your lot. We'll send your budget range within one business day — no obligation.

Free estimate · No obligation. By submitting, you agree to receive calls and SMS from Hillstar Construction about your request. Message & data rates may apply. Reply STOP to opt out. Privacy · Terms.

Hillstar ADU exterior project in Los Angeles Wood and glass ADU exterior built by Hillstar Construction ADU cabinetry and finish work detail

Why Homeowners Choose Hillstar

1

LA Permits, Handled

Plan submission through final inspection. We coordinate with city inspectors — you don't touch the paperwork.

2

Design + Build, One Team

Architectural plans, engineering, and construction under one roof. No handoffs, no lost details.

3

Core Trades In-House

Foundation, framing, electrical, plumbing, HVAC, drywall, and finish — our own crew, not subcontracted.

4

3–6 Months On Site

Most ADU builds complete in 3 to 6 months once construction begins. Clear schedule from day one.

Real Hillstar ADU exterior at twilight

What Homeowners Say

Real 5-star Houzz reviews from Hillstar ADU and guest-house clients.

★★★★★

"Hillstar was great! We did a garage conversion and Lior was the best. He helped us plan every detail."

— Jeffrey Rhodes, January 2019
★★★★★

"Lior was such a pleasure to work with for our guest house remodel. He was so easy to get in touch with, incredibly responsive and finished the job early."

— Amy Christine, February 2019
★★★★★

"Lior and his team were extremely courteous, prompt, and worked hard to make sure every element was exactly what we were looking for."

— Ian, October 2022

★★★★★ 5.0 · 17 reviews on Houzz

ADU Questions, Answered

How long does an ADU project take in Los Angeles?

Timelines vary by project and by how quickly permits move through the city. Most ADU builds we work on complete in about 3 to 6 months once construction begins. We provide a clear schedule at the consultation so you know what to expect at each phase.

Do you handle permits and inspections?

Yes. We handle the full Los Angeles permit process from plan submission through final inspection, and we coordinate directly with city inspectors at every stage. Homeowners don't have to deal with any of the paperwork or back-and-forth with the city.

What types of ADUs can I build on my property?

That depends on your lot size, setbacks, and existing structures. Detached, attached, garage conversion, and above-garage ADUs are all common options in Los Angeles, and we walk through which ones are realistic for your specific property during the first site visit.

What neighborhoods do you serve for ADU construction?

We work with homeowners across the greater Los Angeles area, with a focus on the San Fernando Valley and the Westside. That includes Woodland Hills, Encino, Sherman Oaks, Tarzana, Studio City, Beverly Hills, Bel Air, and West Hollywood, among others. If you're nearby and not sure whether we cover your area, give us a call.

Modern detached ADU exterior built by Hillstar Construction

Ready to Start Your ADU?

Get your free budget range in 24 hours. Licensed & insured · CSLB #972213.

Call Now Free Estimate