ADU construction · Beverly Hills, CA

Beverly Hills ADUs,
Handled End to End

Detached ADUs, attached ADUs, garage conversions, and Junior ADUs — designed, permitted, and built. City of Beverly Hills permits and Architectural Commission review handled in-house. Licensed and insured since 2010. CSLB #972213.

5.0 / 5 on Houzz 17 verified reviews
Free Estimate · No Obligation

Get a Free Beverly Hills ADU Estimate

Tell us about your project — we'll respond within 24 hours.

No obligation. We respond within 24 hours.
By submitting, you agree to receive calls and SMS from Hillstar Construction. Reply STOP to opt out. Privacy · Terms.

CSLB LicensedLicense #972213
5.0 on Houzz17 verified reviews
Family-OwnedLicensed since 2010
24-Hour ResponseFree in-home estimate
City + BHACArchitectural review · in-house
Why Hillstar

Why Beverly Hills Homeowners Choose Hillstar

Licensed and insured since 2010, with a 5.0 Houzz rating, we've refined every step of the ADU process — design, City of Beverly Hills Building & Safety submittal, Architectural Commission review where it applies, construction, and final inspection — so the project finishes on schedule and on budget.

On-Time Delivery

Predictable execution. Milestones agreed during design and tracked to completion — no surprises mid-build.

Transparent Pricing

Itemized written quotes upfront. Scope changes documented and priced. No surprise allowances.

Title 24 & CALGreen Built-In

Solar PV, high-efficiency envelope, electric-ready cooking and water heating, EV-ready circuits. Code-compliant from day one, not retrofit at plan check.

Local Beverly Hills Experts

Daily work with the City of Beverly Hills Community Development Department, Building & Safety, Beverly Hills Architectural Commission (BHAC) review, R-1 estate-zone design standards, and Chapter 7A fire-zone compliance on hillside lots north of Sunset.

Workmanship Guarantee

Written workmanship warranty on every Hillstar Beverly Hills ADU — foundation through certificate of occupancy. Honored, in writing.

One Team, One Contact

Same in-house crew from design to final inspection. One point of contact — no handoff confusion.

Our process

How It Works — Simple & Stress-Free

A proven four-step path from first site visit to a finished Beverly Hills ADU.

1

Free In-Home Consultation

We come to your Beverly Hills property, walk the lot, confirm city-limits jurisdiction (city vs. unincorporated Beverly Crest), check zoning, hillside designation, and feasibility — no pressure, no sales pitch.

2

Design & Permits

Floor plans, elevations, site plan, and a written scope. City of Beverly Hills Building & Safety submittal under California’s statutory ADU review process. Beverly Hills Architectural Commission (BHAC) review, single-family R-1 design review, and hillside review run in parallel where they apply.

3

Build & Inspections

Foundation, framing, plumbing, electrical (including any panel upgrade), Title 24 envelope, finishes — all by our crew. We schedule and meet every Beverly Hills inspection through certificate of occupancy.

4

Walkthrough & Warranty

Final walkthrough with you, punch-list completion, and Hillstar Construction's workmanship guarantee.

Local conditions

Permits, Lots & What's Specific to Beverly Hills

Beverly Hills is its own city with its own building department. State ADU law (Government Code §65852.2) still applies — but the permit path, the design review layer, and the inspection cadence are all different from anything in the City of Los Angeles. Plan accordingly.

Permit jurisdiction

City of Beverly Hills Community Development — Building & Safety — issues every Beverly Hills ADU permit. LADBS does not. The LA City Standard ADU Plan Program is not accepted; designs must be drawn for the Beverly Hills code path. Expect tighter coordination with the city's plumbing, electrical, and final-inspection schedule than the LADBS volume cadence.

Lot & zoning patterns

The Flats below Sunset run to wide, deep R-1 lots that take detached ADUs cleanly. Trousdale Estates, Beverly Crest, and the BHPO (Beverly Hills Post Office) hillside band sit on steeper, view-driven parcels where setbacks, height envelopes, and pad geometry shape every feasibility call. Many estates have generous existing detached garages, which makes garage conversion an unusually clean play here.

Design overlays you'll see here

Hillside parcels above Sunset trigger Beverly Hills hillside review on top of the standard plan check — grading limits, height-envelope rules, and view-impact analysis. Trousdale carries a long-standing single-story design tradition; ADU height and roof form are evaluated against that pattern. Many north-of-Sunset hillside addresses fall inside California Fire Hazard Severity Zones; where they do, Chapter 7A WUI ignition-resistant assemblies and defensible-space compliance apply.

Reviews

What Beverly Hills-Area Homeowners Are Saying

Verified Houzz reviews from recent Hillstar Construction projects.

“Lior is very personable and has many decades of construction experience. We appreciated his sincere evaluation of our project.”

Ann AnterasianHouzz · April 2019

“Lior is a fantastic general contractor. He has tremendous work ethic and strong attention to detail.”

J. GlaserHouzz · June 2017

“Hillstar's crew was courteous, prompt, and worked hard to make every detail exactly what we wanted.”

Hillstar ClientHouzz · Verified
5.0 · 17 verified reviews on Houzz
FAQ

Beverly Hills ADU — FAQ

Lot eligibility, ADU types, City of Beverly Hills permits, BHAC review, hillside, fire zones, tree protection, setbacks, utilities, Title 24, timeline, budget, rental income, and family use — straight answers for your Beverly Hills lot.

Does my Beverly Hills lot qualify for an ADU, and what type fits — detached, attached, garage conversion, or JADU?
Most Beverly Hills lots qualify. California state law (Government Code §65852.2) requires every California city to allow at least one ADU on single-family residential lots, and Beverly Hills is predominantly zoned R-1 with several estate single-family districts (R-1.5X, R-1.6X, R-1.7X, R-1.8X) covering the Flats and the hillside. What changes per lot is the type and size of ADU that fits, plus how it reads from the street and from neighbors. A detached new-build is common on deeper lots in Trousdale Estates and Beverly Crest. An attached ADU shares a wall with the primary house and is useful when the rear yard is tight in the Flats. A garage conversion uses the existing detached-garage footprint and skips many setback rules — common throughout the older parts of the Flats. A Junior ADU (JADU) is carved out of the existing primary home, up to 500 sq ft with its own entrance and efficiency kitchen — often the right answer where the BHAC is sensitive to a new exterior structure, or on smaller lots in the Flats. We confirm zoning, hillside designation, and Architectural Commission review path at the first site visit and recommend the type that fits the property.
Where do I get a Beverly Hills ADU permit — is it LADBS?
No. The City of Beverly Hills is its own incorporated city and issues ADU permits through the Beverly Hills Community Development Department, Building & Safety Division — not LADBS. We handle the Beverly Hills submittal, plan-check corrections, Beverly Hills Architectural Commission (BHAC) review where it applies, and final inspection — end to end. Important note: only properties inside Beverly Hills city limits go through the city. The Beverly Hills Post Office (90210) area also includes parts of the unincorporated Beverly Crest area in LA County, which is permitted through LA County Department of Public Works, not the city. We confirm jurisdiction by parcel at the first site visit.
What is the Beverly Hills Architectural Commission (BHAC), and does my ADU go through it?
The Beverly Hills Architectural Commission (BHAC) is the city's design-review body for exterior architectural design and signage. ADU projects in Beverly Hills typically clear standard ADU plan-check at Building & Safety. R-1 single-family design — particularly larger new construction and significant hillside projects — is reviewed under the city's R-1 design-review framework, which can route to BHAC, the city's Single-Family Design Review, or staff-level Architectural Review depending on project scope, parcel zone, and visibility. Detached new-build ADUs visible from the street, large attached additions, and projects in Trousdale or other estate districts are most likely to require Architectural Commission or design-review approval. Small garage conversions and interior JADUs typically do not. We confirm review path with city planning before drawings are finalized.
How does Beverly Hills handle hillside lots, fire zones, and tree protection for ADUs?
Three site-condition gates apply on top of standard ADU rules. (1) Hillside lots — generally north of Sunset Boulevard, in Trousdale Estates, and on the slopes of Beverly Crest — fall under the city's hillside development standards covering grading, building height measured from natural grade, retaining-wall height, and ridgeline impact. Hillside ADUs typically require a Hillside R-1 Permit pathway and are more design-intensive but remain buildable on most qualifying lots. (2) Hillside parcels north of Sunset and in adjacent canyons fall within a Very High Fire Hazard Severity Zone (VHFHSZ) and are treated as Wildland-Urban Interface (WUI) under Chapter 7A of the California Building Code — ignition-resistant siding and soffits, dual-pane tempered or multi-pane glazing, ember-resistant vents, Class A roof assembly, and defensible-space compliance. (3) Beverly Hills protects designated heritage and protected trees on private property; an ADU sited in the protected zone of a heritage tree can require arborist review, a tree-protection plan, or a shift in the building envelope. We confirm hillside, fire-zone, and tree status at the first site visit.
What about setbacks, utilities, and Title 24 for a Beverly Hills ADU?
State law caps required side and rear setbacks at four feet for new detached or attached ADUs and waives setback requirements when you convert an existing garage in its footprint. Utilities are real work, not paperwork: Beverly Hills Public Works coordinates water and sewer service for new ADUs, and many older Beverly Hills homes need a panel upgrade before the ADU electrical load can land — we size that during design, not on the construction call. Sewer capacity check is part of the submittal. Title 24 (California Energy Code) applies in full: new detached ADUs and significant additions trigger solar PV requirements, mandatory high-efficiency envelope and HVAC, electric-ready provisions for cooking and water heating, and EV-charger-ready circuits where the ADU has parking. We design to Title 24 and CALGreen baseline from day one rather than retrofit at plan-check.
What's a realistic timeline and budget for a Beverly Hills ADU — and how does rental income or family use factor in?
Timeline depends on scope, site conditions, and material lead times. Site visit and feasibility, design and drawings, plan-check, and construction are each scoped during consultation, and we provide a realistic schedule in writing once the design is set. Budget varies with ADU type (detached, attached, garage conversion, JADU), lot conditions, finish level, and any hillside, oak, historic, or HOA review that applies — we provide an itemized written quote after the site visit. Rental income varies by neighborhood, finish, and ADU type, and we model realistic numbers with you. Owner-occupancy: AB 670 and AB 671 mean a detached or attached ADU does not require the owner to live on the property, but JADUs continue to require owner-occupancy of one of the two units. Family use is straightforward — adult children, aging parents, in-law suite, work-from-home flex space — and ADUs configured as family units can later convert to rental without rebuild, provided the design anticipated that path. We provide a written cost breakdown at the consultation.

Planning a Beverly Hills ADU?

Book your free in-home consultation. No pressure. No commitment. Just an honest conversation about your project.

Get My Free Estimate — or call us directly — (310) 975-7590
Call Now Free Estimate